Welcome to NICAT Global Trade LTD!

  • Solutions

The GPP complex and the development of the Kandym group of fields

The Kandym Gas Processing Plant (GPP) is a key facility in the development of the Kandym group of fields in Uzbekistan. The Kandym GPP is the largest gas processing plants in Central Asia.

Supply of equipment and materials for systems:

  • Security alarm system;
  • Fire alarm system;
  • Gas fire extinguishing system;

M-25 field development and construction of boysun gas processing plant.


Development of Mustakillikning 25 Yilligi field, with the construction of a gas processing plant and all the required infrastructure facilities in order to ensure the production, treatment and processing of high-sulfur natural gas in the amount of 5.0 billion cubic meters per year, supplied from the field development facilities, and receiving marketable products — sales gas for further transportation via the export gas pipeline and granulated and lumpy sulfur.

Nominal design capacity is 5.0 billion Nm³ per year (2 trains of GPP for processing 2.5 billion Nm³ per year each).

Production range of GPP commercial products:

  • Sales gas — up to 4.4 billion cubic meters per year;
  • Granulated sulfur — up to 460 thousand tons/year (clarification will be made by calculation).

Supply of equipment and materials for systems:

  • Security alarm system;
  • Closed-circuit television system (CCTV);
  • Access monitoring and control system;
  • System for detecting sabotage and terrorist means;
  • Data transmission system;
  • Fire alarm system;
  • Gas fire extinguishing system.

Construction of copper enrichment plant № 3 complex with a full technological cycle of production based on AGMK

  • Expansion of production capacities of JSC Almalyk mining and metallurgical complex by 60 mln tons and expansion of non-ferrous and precious metals production on the basis of deposits of JSC Almalyk MMC provides for construction of copper facilities concentrating plant No. 3 (MOF-3) with annual mining and processing capacity of 60 million tons of ore.
  • Expansion of non-ferrous and precious metals production on the basis of deposits of JSC Almalyk MMC provides for construction of copper facilities concentrating plant No. 3 (MOF-3) with annual mining and processing capacity of 60 million tons of ore.

Supply of equipment and materials for systems:

  • Perimeter security alarm system;
  • Security alarm system inside the premises and structures;
  • CCTV;
  • System for detecting sabotage and terrorist weapons;
  • Access control and management system;
  • Distributed Public Address System;
  • Guaranteed power supply system.

Construction of chemical production plant for complex mineral fertilizers in Samarkand region


Construction of a modern environmentally friendly chemical production plant for complex mineral fertilizers within the territory of Samarkandkimyo JSC.

The project is aimed to provide for agricultural sector demand for complex mineral fertilizers and create at least 250 new work places.

Facility design capacity:

  • Production of sulfuric acid — 800 000 tpa
  • Production of phosphoric acid — 280 000 tpa as P2O5
  • Production of MAP (G) (N: 12, P2O5: 52) — 525 ktpa
  • Power generating unit capacity is is 26 MW

Сompleted work:

  • supply of equipment for security systems.